House Floor Plan
₹3/ sq ft
ground floor · upper floors ₹2 / sq ft
- Room layout for every floor with dimensions
- Doors, windows and furniture placement
- Vastu on request
📦 Printed set couriered + PDF
Order floor planGet a ready‑to‑use daily progress report format for Bidar, see a filled example for a G+1 house, and discover why dated photos protect payments.
Site engineers and supervisors in Bidar know that a clear, dated record of daily activities is the backbone of smooth project execution. Whether you are reporting to the client office in Bidar City Centre or to the head office in Bangalore, a well‑structured Daily Progress Report (DPR) eliminates guesswork, speeds up approvals, and safeguards you against payment or quality disputes months later.
A DPR is more than a checklist; it is a legal snapshot of the site on a given day. The following elements should appear in every report, regardless of project size:
Below is a copy‑and‑paste ready table you can embed in Word, Excel or the Balaji Workspace app.
| Date | Weather | Man‑power (Trade) | Work Done vs. Plan | Materials Received | Materials Consumed | Equipment On Site | Issues / Delays | Photos (link) |
|---|---|---|---|---|---|---|---|---|
| 2026‑10‑12 | 28°C, Sunny | Masons 4, Carpenters 2, Labour 6 | Formwork for 1st‑floor slab completed (planned) | Cement 30 bags, Steel 200 kg | Cement 28 bags, Steel 190 kg | Concrete mixer 1, Scissor lift 1 | None | View |
Consider a typical G+1 house (approximately 1,000 sq ft) being built in the Ramanagar locality of Bidar. The client expects a daily update every evening. Below is a filled DPR for Day 5 of the construction schedule.
| Date | Weather | Man‑power (Trade) | Work Done vs. Plan | Materials Received | Materials Consumed | Equipment On Site | Issues / Delays | Photos (link) |
|---|---|---|---|---|---|---|---|---|
| 2026‑10‑12 | 28°C, Sunny | Masons 4, Carpenters 2, Labour 6 | Formwork for 1st‑floor slab completed; concrete poured 12 m³ (planned) | Cement 30 bags, TMT 200 kg, Sand 2 m³ | Cement 28 bags, TMT 190 kg, Sand 1.9 m³ | Concrete mixer 1, Vibrator 1 | Minor delay in steel delivery (30 kg arrived late) | View |
The engineer signs the report, uploads the three photos (formwork, concrete pour, finished slab) to Balaji Workspace, and shares the auto‑generated link with the client. The client can view the report without creating an account, and the timestamped photos become proof of work completion.
In Bidar, many contractors rely on verbal hand‑overs or handwritten notes. When a payment claim is raised weeks later, the client may question the quality of the concrete, the alignment of walls, or the exact date of completion. A dated, high‑resolution photo attached to the DPR provides indisputable evidence:
Because the photos are stored in the cloud with a server‑generated timestamp, neither party can alter the image later, making it a powerful tool for fast, amicable settlement.
When a client disputes progress, the engineer’s written DPR becomes the first line of defence. Courts in Karnataka often treat DPRs as “contemporaneous records” that carry evidentiary weight. A comprehensive report demonstrates that:
Thus, a daily record not only speeds up payment but also shields the engineer’s professional reputation.
The table below lists the major concrete‑related line items for a typical G+1 house built in the Gulbarga Road area of Bidar. Quantities are based on standard Indian residential construction norms, and costs reflect the average market rates in 2026.
| Item | Quantity | Unit Cost (₹) | Total Cost (₹) |
|---|---|---|---|
| Cement (OPC 53) | 120 bags (50 kg each) | 340 | 40,800 |
| TMT Steel (Fe 500 D) | 2,800 kg | 55 | 154,000 |
| Red Bricks / Blocks | 12,000 pcs | 8 | 96,000 |
| River Sand | 25 m³ | 1,200 | 30,000 |
| Coarse Aggregate | 20 m³ | 1,400 | 28,000 |
| Labour (Skilled + Unskilled) | 1,200 man‑hours | 120 | 144,000 |
| Total | 492,800 |
These figures are meant as a baseline; actual costs may vary with site conditions, supplier negotiations, and the chosen finish quality.
Ignoring these items can cause budget overruns and delay the final handover.
Balaji Workspace captures everything you log during the day – labour count, material receipts, and photos – and instantly builds a professional DPR that the client can open on any device without an account. Access the free web version at balajibuilds.com/workspace or download the Android app from Google Play. No brokerage fees, no hidden charges.
Get a quick, zero‑brokerage cost estimate for your plot in Bidar by visiting Balaji Builds Estimate. The tool uses real‑time market rates and local construction norms to give you a transparent figure.
All building permits in Bidar are issued by the Bidar Municipal Council under the Karnataka Town and Country Planning Act. Applications must be submitted at the council office in the city centre.
The DPR should be completed at the end of every working day, even if the site is partially idle due to weather or material delays. Consistency ensures accurate progress tracking.
Yes. The app stores entries locally and syncs automatically when you regain connectivity, so you never lose a day's data.
The average market price for Fe 500 D TMT steel in Bidar is around ₹ 55 per kilogram, though bulk purchases may fetch a small discount.
Yes. When time‑stamped and stored as part of a contemporaneous DPR, photos are admissible as documentary evidence to verify work quality and dates.
Order online · delivered to your door
Fixed prices, no visits needed. Pay 50% now and the rest after we courier it to you. Courier is included.
₹3/ sq ft
ground floor · upper floors ₹2 / sq ft
📦 Printed set couriered + PDF
Order floor planfrom ₹7,999
G+1 ₹9,999 · G+2 ₹11,999
📦 Printed set couriered + PDF
Order elevation₹1,999
signed and sealed
📦 Signed original couriered + PDF
Order estimate₹1,999
ground floor · +₹500 per upper floor
📦 Couriered to you + PDF
Order property plan₹99
for your own house
⚡ Instant on WhatsApp
Get my Build Plan₹99
for your own house, engineer-style
⚡ Instant PDF + link on WhatsApp
Calculate & get report✓ Courier included ✓ Track your order online ✓ Full refund if you cancel before we start