Build Plan
โน99
for your own house
- What to buy each week, with quantities
- Checks before every contractor payment
- Contractor quote comparison sheet
โก Instant on WhatsApp
Get my Build PlanYou've used an online calculator and got โน32 lakh. A contractor quotes you โน28 lakh. Another quotes โน41 lakh. Who's right? This article explains what each tool is good for, where each one fails, and how to use both together to arrive at a number you can actually trust.
A construction cost calculator gives you a market rate baseline โ what the average project of your type should cost in your city right now. It's built on aggregated material and labour data, and it's completely unbiased. Nobody has a margin to protect.
A detailed contractor quote (also called a Bill of Quantities or BOQ) tells you exactly what is being built and at what price. A good quote includes:
If your contractor gives you only a lump sum โ "โน28 lakh for everything" โ that is not a quote. It's a number. Without a BOQ, you have no protection against substitution of cheaper materials, quantity reduction, or disputes later.
| Factor | Online Calculator | Contractor Quote |
|---|---|---|
| Bias | None | Contractor's financial interest |
| Speed | Instant | 3โ7 days for a proper BOQ |
| Accuracy | ยฑ15โ20% | ยฑ5โ10% if BOQ is detailed |
| Site-specific factors | Generic assumptions | Can reflect actual site conditions |
| Best use | Budgeting & benchmarking | Finalising scope and contract |
| Cost | Free | Free (but time-intensive to compare) |
| Risk | May miss site complications | May hide exclusions or inflate margin |
Follow this 4-step process for any construction project:
A good online construction cost calculator is accurate to within ยฑ15โ20% for standard residential construction. It uses city-wise material and labour rates and is best used for early-stage budget planning and benchmarking contractor quotes. It cannot account for unusual site conditions, special design elements, or current local material prices.
Contractor quotes in India can vary 20โ40% for the same project because: different material specifications (grade of steel, cement brand), different labour rates based on their current workload, some quotes exclude items like electrical and plumbing, and some contractors inflate margins anticipating negotiation.
Always compare: steel grade (Fe500D vs Fe415), cement brand and grade (OPC 53 vs PPC), tile quality and brand, number of electrical points and switch brands, type of plumbing pipes (CPVC vs PVC), and whether sanitary fixtures are included. Two quotes at the same total price can have very different quality specs.
Order online ยท delivered to your door
Fixed prices, no visits needed. Drawings and estimates: add one or more to your cart and pay 50% now; pay the rest when the work is ready, then we courier it (courier included). Documents and reports come as a PDF.
โน99
for your own house
โก Instant on WhatsApp
Get my Build Planโน15
RTC โน15 ยท signed RTC โน29 ยท EC โน65 ยท title report โน379
โก PDF on WhatsApp
Order land documentsโน4,000
G+1 โน6,000 ยท up to 2,500 sq ft
๐ฆ Printed set couriered + PDF
Order floor planfrom โน7,999
G+1 โน9,999 ยท G+2 โน11,999
๐ฆ Printed set couriered + PDF
Order elevationโน1,999
signed and sealed
๐ฆ Signed original couriered + PDF
Order estimateโน3,500
ground floor ยท +โน1,000 per upper floor
๐ฆ Printed set couriered + PDF
Order sanction drawingโน1,999
ground floor ยท +โน500 per upper floor
๐ฆ Couriered to you + PDF
Order property planโน99
for your own house, engineer-style
โก Instant PDF + link on WhatsApp
Calculate & get reportโน99
for your own floor plan ยท free check first
โก Instant PDF + link on WhatsApp
Check my Vastuโ Courier included ย โ Track your order online ย โ Full refund if you cancel before we start